From:                              route@monster.com

Sent:                               Saturday, April 16, 2016 2:07 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: NSN Construction Manager

 

This resume has been forwarded to you at the request of Monster User xapeix03

Antonia Chambers 

Last updated:  04/30/15

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received

12586 HUNTINGTON TRACE
Alpharetta, GA  30005
US

Mobile: 4702558747   
antonia.chambers@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Antonia Chambers Construction Management Resume 2015.docx

Resume Value: 2mek9b2k3b8xhu2p   

  

 

ANTONIA CHAMBERS

12586 Huntington Trace, Alpharetta, GA 30005

Antonia.chambers@gmail.com

470-255-8747

 

 

Objective:

To gain the position of a Wireless Project Manager where my ten years of progressive telecommunication wireless experience will contribute towards the growth of the organization..

 

Skills/Keywords:

Sprint-Siterra, MS Office, NSN, COP, DAS

ALU-FST, RRU, RBS 3106, 3206, GPS, construction management, PM

Ericsson- Site Handler, integration, commissioning, LTE, Small Cell

TEMS, 4G, VOLTE, VoIP, NOC, site audits, Fiber, LMR

 

Work History:

 

National Cell Site Construction Manager (ALU/Sprint)                                        Jan. 2013-Dec. 2014

MPI Industries, LLC – Boston, MA, remote work from home in GA

 

·   Responsible for the overall planning, budgeting, and document keeping aspects of the cell site closeout process for Sprint’s Network Vision and 2.5 Commissioning and Integration Project

·   Developed and executed strategic plans in order to ensure that quality COP (Close Out Packages) were delivered

·   Extensive knowledge of Sprint’s Siterra and ART Tool databases

·   Worked closely with upper management to make sure that the scope and the direction of our project was on schedule

·   Project budgeted at 300M

·   Assisted ALU financial team each month with managing billing and receivables, along with processing vendor submitted SAF

·   Identified that all OOS submitted invoicing was correct and approved

·   Managed tiger teams on Blitz Cleanup project

·   Trained field CMs and GC on the processes involved in completing closeout packages

·   Held quarterly safety and quality meetings for the NE region.

·   Conducted weekly meetings with project team to discuss change order requests, quality issues, and any risks, assumptions or constraints in regards to the project

·   Built strong solid work relationships by providing timely, accurate, and high quality information to our customer and upper management

·   Reviewed As-Built/Red-Lined CD’s as needed

 

Field Cell Site Construction Manager (ALU/CSpire)                                              May 2012-Jan.2013

MPI Industries, LLC – Jackson, MS and Biloxi, MS

 

·   Scheduled pre-construction site walks with GC’s to identify any pre-existing conditions prior to construction start

·   Held safety meetings, inspected all permits,  and made sure that all equipment used on the towers were in proper working condition

·   Sign completed JSA forms

·   Attended daily market calls with ALU market lead for site construction statuses and SAP approvals

·   Obtained any special permits/clearances needed to gain access to government restricted areas

·   Created BOM’s ( Bill of Materials) for each new cell site and uploaded PDF to FST

·   Reviewed all closeout documents and photos

·   Informed RF team of any need changes to be made to the site’s RFDS

·   Scheduled post-construction site walks with GC, signed any red-lined CD’s

 

Commissioning Engineer/Team Lead                                                                     Mar.2012-May 2012

New World Technology, Inc. – Dallas, TX

 

·   NSN (Nokia Siemens Network) Flexiswap Project

·   Preformed installation, commissioning, and integration of Nokia FlexiBTS

·   Software and Hardware upgrades

·   Cleared on-site alarms

·   Monitored Anritsu sweeps testing for VSWR, return loss, and DTF

·   Perform functionality tests (video calls, mms)

·   Site Acceptance

 

Construction Manager (Ericsson/T-Mobile/Claro)                                                   Dec.2011-Mar.2012

Tangent International – San Juan, PR

 

·   Supervised equipment delivery and installation

·   Antenna and RRU swaps

·   Integrated 1st and 2nd carrier UMTS equipment

·   Coordinated the day-to-day activities of both the contractors and the vendors while they finished up final punch lists and site walks

·   QC/QA

·   Maintenance window site cut-overs

 

Field Test Supervisor (Ericsson/AT&T)

Astron Consulting – New York City and the Surrounding Boroughs, NY             Jan. 2011-July 2011

 

·   Followed Ericsson MOPs, test plans

·   Installed RAX/TX60 boards into 3206 UMTS cabinets along with 2nd carrier radios and filters

·   Repositioned RF LTE jumpers

·   Installed SIAD, MU, Fiber, GPS and GPS receivers

·   EMAS, Site Handler, DAM, DUL scripting

 

Network Integration Carrier Add Engineer (Ericsson/TMO)                                 July 2010-Jan 2011

Avenger Engineering – Biloxi, MS

 

·   Integrated both 1st and 2nd carrier UMTS 3206 cabinets

·   Installed RAX/TX60 cards for nationwide LTE upgrade

·   Provided detailed drawing of all the other carriers in the cell site compound

·   Took pre and post install photos if the equipment and the compound

 

Microwave Pathing Technician (New World Technology/Clearwire)                   Feb.2009-Mar.2010                                                

Teksystems – Greensboro, High point, Winston Salem, NC

 

·   Responsible for the installation and programming of Dragonwave’s Horizon Duo Modem, Ceragon Modem, Orthogons, PTP600/400 Microwave equipment

·   Ran -48V power cables from breaker box to the equipment cabinet

·   Cleared trouble tickets during the maintenance window with the NOC

·   Loaded scripts containing frequency, capacity, and TX power information

·   Achieved target RSL levels that were within a -2dBm error margin

·   Worked with commissioning team to bring new site build on air

·   CPP Certified

·   Provided customer support by going out on truck rolls troubleshoot Clearwire Modem issues

 

Switch Site Auditor (Bridge Networks/Sprint)                                                       Apr.2008-Jan.2009

Teksystems – Charlotte, NC and Norfolk VA

 

·   Performed switch audit on all connected equipment

·   Responsible for locating and documents all DSX1/DSX3/ODX bay positions along with LEC/MANRING locations

·   Input relay rack, patch panel, and port locations of the equipment associated with that switch

·   Documented all OC3/OC12 Motorola information

·   T1 aggregators

·   SPM, VPU, MGX, DTC, VM Nortel

·   Gathered all onsite information and created a plan that would ensure that the switch was energy efficient

 

 

Education:

Surry Central High School – Diploma 2002

10+ years of Telecom Experience in various roles

 

Certifications:

CPR

CPP connectors

Ericsson HS1/B3

 

References:

Available Upon Request

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Construction Manager

Sprint

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Manager (Manager/Supervisor of Staff)

Work Status:

US - I am authorized to work in this country for any employer.

 

 

Target Job:

Target Job Title:

Mid to Upper Level PM/CM Position

Desired Status:

Full-Time

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US

Relocate:

Yes

Willingness to travel:

Up to 50% travel